Scope Of Work

HVAC AS PER ISHRAE / ARI / ASHRAE SPECIFICATION

• Project Designing

• Basic Engineering

• Site Execution Planning

SUPPLY INSTALLATION TESTING & COMMISSIONING

• Air Handling Units

• Force Draft Ventilation Units

• Exhaust Air Units

• Chillers / DX Coils Condensing Units

• Chilled water condensed water piping with insulation.

• Gl Ducting as per standards.

• Thermal Insulation

• Return Air Risers

• Terminal Housing Module

• Microvee / Hepa / Carbon Filters

• Window / Split / FCU’s and Ductable Units

• Megnahelic Gauges

MODULAR CLEAN ROOM PANELS WITH COVING

• Single Doors / Double Doors

• Walkable / Non Walkable Fall Ceiling

• Inbuilt Return Air Risers

• Service Utility Panel

• Clean Room Light Fixtures

• Epoxy Flooring

VALIDATION WITH DOCUMENTATION :

• DQ/IQ/PQ/OQ/SQ

•AS PER US FDA/WHO


^